Tunnel Drilling Machines

Tunnel lining machine
Tunnelausbaumaschine
Downloads: 

Tunnel lining machine

Application
Tunnel lining machine

Customer

Herrenknecht AG Tunnelvortriebstechnik

Location

roadworks in tunnel (Moscow)

Travel length

up to 600 m

Travel speed

average of 10 m/day

Festoon System
(Heavy Duty) Program 340; 4 systems

Quantity of cable trolleys

182

Total weight of cable trolleys

23 to.

Specific features

Tunnel lining machine with 4 units which move with different speed and compensate a grade of 5%