Cable Car

Transfer between Airport terminal and train station [cable liner system | DCC]Transfer between Airport terminal and train station [cable liner system | DCC]Transfer between Airport terminal and train station [cable liner system | DCC]
Downloads: 

Transfer between Airport terminal and train station [cable liner system | DCC]

Application
Transfer between Airport terminal and train station [cable liner system | DCC]

Country

Great Britain

City

Birmingham

Representative office

Conductix-Wampfler AG [D]

Operator

Doppelmayr [DCC]

Customer
Siemens, Austria

Technical requirement[s]

Electrification of the interior equipment in a People Mover

Product

Conductor Rail, Program 0812 SinglePowerLine

Number of [Load]

2

Travel distance [Load]

2 x 600 m

Travel speed [Load]

36 km/h

Number of poles

3 + PE

Collector assembly

double collector

Current

100 A

Voltage

400 V [AC]

Additional information

  • In operation: 22 hrs./day
  • System capacity: 1.600 people per hour/direction
Relevant Products

Single PowerLine 0812